Granulation process and installation plan of NPK fertilizer production equipment

The user has purchased NPK fertilizer manufacturing process, and after the installation of the equipment, it needs to carry out trial run or trial production. In the process of trial production, we need to constantly adjust and modify to produce high-quality and qualified fertilizer materials. So what should we pay attention to in the process of fertilizer production equipment operation?


What should be paid attention to in the installation and commissioning of fertilizer equipment

1. Attention should be paid to the installation of fertilizer equipment, which should be installed on a horizontal concrete foundation and fixed with anchor bolts.

2. When installing fertilizer equipment, the main body should be vertical to the horizontal.

3. After installation, check whether the bolts of each part are loose and whether the main engine compartment door is tight. If so, tighten it.

4. We should carry out according to the power of fertilizer equipment, and configure the power line and control switch according to the power of equipment.

5. Finally, we should pay attention to that after the installation and inspection, the NPK fertilizer granulator will carry out the no-load test run, and the production can be started when the test run is normal.
We are a professional manufacturer of fertilizer equipment, specializing in providing a complete set of fertilizer manufacturing process equipment, direct supply from the manufacturer, saving you the price difference of the middleman, ensuring the reasonable rights and interests of consumers, and perfect after-sales, which has been recognized by customers for a long time.